Hyperion
A planned AI data center in Louisiana owned by Meta Platforms.
Meta Platforms is building the Hyperion data center in Richland Parish, Louisiana. The facility aims to provide five gigawatts of compute capacity for artificial intelligence training and inference.
- Planned investment exceeds US$50 billion.
- Capacity targets five gigawatts of compute.
- Owned by Meta Platforms via off-balance-sheet entity.
- Located in Richland Parish, Louisiana.
- Full build-out expected around 2032.
What it is
The Hyperion project, officially known as the Richland Parish Data Center, is a massive artificial intelligence infrastructure site located in Holly Ridge, Louisiana. Meta Platforms owns and operates the facility, which sits on a former agricultural plot called Franklin Farms. The campus spans 2,250 acres with a total floor area of four million square feet. It is designed to deliver up to five gigawatts of computational power to support Meta's long-term goals in artificial intelligence research and superintelligence development.
How it came about
Meta began scouting locations in early 2024 under the secret codename Project Sucre to avoid corporate espionage. The company initially hid its involvement through a shell subsidiary named Laidley LLC. After securing tax incentives from the Louisiana government via Act 730, Meta purchased the land. The project was publicly announced in December 2024. In July 2026, Meta revealed plans to expand the facility's capacity to five gigawatts, raising the total investment value beyond fifty billion dollars.
The compute
The facility is engineered to handle five gigawatts of electrical load for high-performance computing tasks. Meta expects approximately two gigawatts of this capacity to become operational by 2030, with the entire campus fully built out around 2032. Entergy Corporation is responsible for supplying the necessary electricity, planning to generate at least 3.8 gigawatts specifically for this operation through new combined-cycle gas plants and grid upgrades.
Where the GPUs are
Hyperion is situated along Louisiana Highway 183 in Richland Parish, just outside the town of Holly Ridge. The site occupies a large contiguous plot previously owned by the Franklin family before being acquired by the state. The physical footprint covers 2,250 acres, providing ample space for the extensive server halls and supporting infrastructure required for such a large-scale industrial complex.
Customers and deals
Meta Platforms is the primary tenant and operator of the Hyperion facility. The structure is financed through an off-balance-sheet arrangement involving Blue Owl Capital, where Meta acts as the minority partner. An irrevocable lease starting in 2029 commits Meta to approximately twelve point three billion dollars in initial payments, backed by bond guarantees over two decades.
Money and ownership
Initial financing estimates started at twenty-seven billion dollars, but the scope expansion pushed the projected cost above fifty billion dollars. The project utilizes a complex financial structure managed by Beignet Investors, a special purpose vehicle led by Blue Owl Capital. This setup allows Meta to secure the asset while keeping the debt off its main balance sheet, relying on long-term lease payments to service the bonds.
Its place in AI
Hyperion represents one of several 'titan clusters' intended to prepare for potential artificial superintelligence. Meta CEO Mark Zuckerberg has stated that achieving superintelligence is inevitable, driving these massive investments. The project has drawn significant attention for its scale, often compared to the size of Manhattan in public visualizations, marking a major shift in how hyperscalers approach infrastructure needs.
Questions and criticism
Local residents have raised issues regarding increased traffic, gentrification, and the use of out-of-state construction workers despite promises to hire locally. Environmental groups like the Sierra Club and Earthjustice have criticized Meta's renewable energy claims and sought legal action regarding environmental compliance. Additionally, local power outages have been reported during construction, contradicting assurances about grid stability.
Questions people ask about Hyperion
Who owns the Hyperion data center?
Meta Platforms is the owner and operator. However, the facility is held through Beignet Investors, a joint venture with Blue Owl Capital, allowing Meta to lease the space while keeping the asset off its main balance sheet.
How much will Hyperion cost?
The total planned investment is more than US$50 billion. This figure rose from earlier estimates of twenty-seven billion dollars following an announcement in July 2026 regarding expanded capacity and land usage.
When will the data center be ready?
Roughly two gigawatts of capacity are expected online by 2030. The full campus build-out is scheduled to be completed around 2032, with an initial lease commitment starting in 2029.
Good reading and sources
- Official websiteOfficial site
- Mark Zuckerberg says Meta is building a 5GW AI data centerTechCrunch, Article
- To land Meta鈥檚 massive $10 billion data center, Louisiana pulled out all the stops. Will it be worth it?CNBC, Article
- Meta to spend hundreds of billions on AI data centres, says Mark ZuckerbergBBC, Article
- Louisiana Hands Meta a Tax Break and Power for Its Biggest Data CenterWired, Article
The facts on this page come from the Wikipedia article "Hyperion Data Center", written by its contributors and used under the CC BY-SA 4.0 licence, and from its Wikidata record (CC0). EveryNeocloud rewrote the text in its own words, with AI assistance, and compares every page with the article to make sure no passage is copied. It may be reused under the same CC BY-SA 4.0 licence with a link back.
It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-17.