News
DealsCorvex agrees USD 103 million take-or-pay deal to perform AI inference with Mid-Atlantic GPUsSovereignNeysa scales AI infrastructure in India with AMD Instinct MI350X GPUs on TytanSovereignNeysa Deploys AMD GPU Cluster in Mumbai for AI Training and InferenceInferenceMicrosoft Foundry adds Baseten, DeepSeek AI inference (MSFT:NASDAQ)ClustersWhat Does Hewlett Packard Enterprise (HPE) Gaining A Top 14 AI Supercomputer Mean?ClustersDataOne and Rowan University sign engineering co-op program agreement for DataOne's Vineland AI factoryClustersLook inside Cal Poly's $3 million AI Factory (Video)DealsOpenAI Taps AMD Chips for 457 MW of AI Capacity in Six-Year TensorWave DealClustersCal Poly launches an AI data center on campus. Take a look insideInferenceArista takes aim at the next AI network battleground: distributed inferenceDealsCorvex agrees USD 103 million take-or-pay deal to perform AI inference with Mid-Atlantic GPUsSovereignNeysa scales AI infrastructure in India with AMD Instinct MI350X GPUs on TytanSovereignNeysa Deploys AMD GPU Cluster in Mumbai for AI Training and InferenceInferenceMicrosoft Foundry adds Baseten, DeepSeek AI inference (MSFT:NASDAQ)ClustersWhat Does Hewlett Packard Enterprise (HPE) Gaining A Top 14 AI Supercomputer Mean?ClustersDataOne and Rowan University sign engineering co-op program agreement for DataOne's Vineland AI factoryClustersLook inside Cal Poly's $3 million AI Factory (Video)DealsOpenAI Taps AMD Chips for 457 MW of AI Capacity in Six-Year TensorWave DealClustersCal Poly launches an AI data center on campus. Take a look insideInferenceArista takes aim at the next AI network battleground: distributed inference
EveryNeocloud
This is the official logo for the YTL Group holding company, YTL Corporation Berhad.

YTL Corporation

Malaysian infrastructure group running AI data centres and Nvidia cloud capacity

Photo: YTL Corp Berhad, CC BY-SA 4.0, via Wikimedia Commons

YTL Corporation Berhad is a Malaysian infrastructure conglomerate founded in 1955 by Yeoh Tiong Lay, active in power, water, cement, property, telecoms and data centres. Its YTL Power arm runs the Green Data Center Park in Kulai, Johor, which hosts Nvidia cloud supercomputers for AI work, with expansion under way.

Share on WhatsApp

  • Founded in 1955 by Yeoh Tiong Lay; based in Kuala Lumpur
  • Green Data Center Park in Kulai, Johor hosts Nvidia AI supercomputers
  • April 2026 plan to double Kulai capacity beyond 500 MW within three years
  • First non-Japanese Asian firm listed in Tokyo, in 1996
  • Revenue RM 29.62 billion in 2023; 12,627 employees

What it is

YTL Corporation Berhad is a Malaysian multinational built around infrastructure. Power generation, water and sewerage form the core, but the group also covers cement, property, hotels, telecoms, digital banking, education, data centres and cloud computing. Its YTL Power subsidiary owns YTL Data Center Holdings, which runs facilities in Sentul, Kuala Lumpur, and Kulai, Johor. The Kulai site, branded the Green Data Center Park, hosts Nvidia cloud supercomputers aimed at artificial intelligence work. Utilities bring in 71% of group revenue, with cement at 16% and construction and hotels at 4% each. The company employs 12,627 people and reported RM 29.62 billion of revenue in 2023.

How it came about

Yeoh Tiong Lay founded the business in 1955. It grew into a group spanning power, water, cement, property and transport, and listed on Bursa Malaysia. In 1996 it became the first non-Japanese Asian company admitted to the Tokyo Stock Exchange's Prime Market Foreign Stocks Segment. Francis Yeoh Sock Ping chairs the company and Yeoh Seok Kian is managing director. In May 2024 YTL Power took a substantial shareholding in Ranhill Utilities. July 2024 brought a planned move into industrialised building systems via YTL Cement and Singapore's NSL Ltd. April 2026 saw YTL Cement buy control of Concrete Engineering Products Bhd (Cepco).

The compute

The AI side sits inside YTL Power, through YTL Data Center Holdings. Its Green Data Center Park in Kulai, Johor, houses Nvidia cloud computing supercomputers directed at artificial intelligence applications. A second facility runs in Sentul, Kuala Lumpur. In April 2026 YTL Power said it would speed up the Kulai build-out, targeting a doubling of capacity within three years beyond the 500 MW originally planned, with commitments already secured for up to 300 MW. To pay for that growth the company was weighing a separate listing of the data centre unit alongside bond or sukuk issues.

Where the GPUs are

Malaysia holds the core of the group. YTL Power runs combined cycle plants of 1,212 MW at Paka in Terengganu and Pasir Gudang in Johor. Data centres sit in Sentul, Kuala Lumpur, and Kulai, Johor. Beyond Malaysia, YTL PowerSeraya in Singapore has 3,100 MW of licensed generation, Wessex Water serves 2.9 million UK customers, and power investments reach Indonesia through PT Jawa Power and PT Jawa Timur, and Jordan through Attarat Power.

YTL Corporation
A drawing made by EveryNeocloud from what this page says. It is a diagram, not a picture of the real provider.

Customers and deals

Nvidia is named as the tenant whose cloud computing supercomputers sit in the Kulai Green Data Center Park. In April 2026 YTL Power reported commitments for up to 300 megawatts at that campus. Elsewhere the group serves water customers through Wessex Water in the UK and telecoms users through the YES brand in Malaysia.

Money and ownership

Revenue reached RM 29.62 billion in 2023, with net income of RM 2.12 billion and assets of RM 81.46 billion. Total financial capital stood near RM100 billion in June 2024. Shares trade on Bursa Malaysia under 4677 and on the Tokyo Stock Exchange under 1773. For the data centre build-out, YTL Power was considering a separate listing of that unit plus bond or sukuk issuance. In April 2026 YTL Cement paid RM103.8 million for a 53.49% stake in Cepco, at RM2.60 per share.

Its place in AI

YTL became the first non-Japanese Asian company listed in Tokyo in 1996. Its Kulai campus is one of the places where Nvidia's AI cloud capacity is hosted in Southeast Asia, and the group links that computing estate to its own power generation. The company also runs the KLIA Ekspres and KLIA Transit rail links and develops property such as Sentul and Brabazon at Filton Airfield in Bristol.

Questions and criticism

Funding the data centre expansion is an open question: YTL Power was weighing a separate listing of the unit alongside bond or sukuk issuance. The Cepco purchase triggered a mandatory general offer for the remaining shares under Malaysian capital markets rules, at a 39% premium to the prior close.

Questions people ask about YTL Corporation

What does YTL Corporation do?

It is a Malaysian infrastructure conglomerate covering power generation, water and sewerage, cement, property, hotels, telecoms and rail. Utilities supply 71% of revenue. Through YTL Power it also runs data centres and cloud computing for artificial intelligence, including Nvidia supercomputers at Kulai in Johor.

Where is its AI computing located?

YTL Data Center Holdings, part of YTL Power, runs facilities in Sentul, Kuala Lumpur, and at the Green Data Center Park in Kulai, Johor. The Kulai site hosts Nvidia cloud supercomputers for AI applications, with capacity expansion under way from a 500 MW base.

How large is the data centre expansion?

Announced in April 2026, the plan aims to double capacity at the Kulai park within three years beyond the 500 MW first planned. At that point YTL Power had secured commitments for up to 300 megawatts. Funding may come from a separate listing of the unit, or from bonds or sukuk.

How is the company owned and listed?

It is a public company founded in 1955 by Yeoh Tiong Lay, chaired by Francis Yeoh Sock Ping with Yeoh Seok Kian as managing director. Shares trade on Bursa Malaysia under 4677 and on the Tokyo Stock Exchange under 1773, where it listed in 1996 as the first non-Japanese Asian firm.

Good reading and sources

Where this page comes from

The facts on this page come from the Wikipedia article "YTL Corporation", written by its contributors and used under the CC BY-SA 4.0 licence, and from its Wikidata record (CC0). EveryNeocloud rewrote the text in its own words, with AI assistance, and compares every page with the article to make sure no passage is copied. It may be reused under the same CC BY-SA 4.0 licence with a link back.

It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

Photo credits on this page

The small pictures above come from Wikimedia Commons under free licences. Some are cropped to fit.

The weekly digest

Every Monday: the provider of the day, new pages on EveryNeocloud, and the conferences and anniversaries of the week ahead.