DealsCorvex agrees USD 103 million take-or-pay deal to perform AI inference with Mid-Atlantic GPUsSovereignNeysa scales AI infrastructure in India with AMD Instinct MI350X GPUs on TytanInferenceMicrosoft Foundry adds Baseten, DeepSeek AI inference (MSFT:NASDAQ)ClustersDataOne and Rowan University sign engineering co-op program agreement for DataOne's Vineland AI factoryClustersLook inside Cal Poly's $3 million AI Factory (Video)DealsOpenAI Taps AMD Chips for 457 MW of AI Capacity in Six-Year TensorWave DealClustersCal Poly launches an AI data center on campus. Take a look insideInferenceArista takes aim at the next AI network battleground: distributed inferenceDealsOpenAI Signs 457 MW AI Data Center Deal as AMD Expands Its Challenge to NvidiaClustersBehind Dell AI Factory’s NVIDIA & AMD Enterprise ExpansionDealsCorvex agrees USD 103 million take-or-pay deal to perform AI inference with Mid-Atlantic GPUsSovereignNeysa scales AI infrastructure in India with AMD Instinct MI350X GPUs on TytanInferenceMicrosoft Foundry adds Baseten, DeepSeek AI inference (MSFT:NASDAQ)ClustersDataOne and Rowan University sign engineering co-op program agreement for DataOne's Vineland AI factoryClustersLook inside Cal Poly's $3 million AI Factory (Video)DealsOpenAI Taps AMD Chips for 457 MW of AI Capacity in Six-Year TensorWave DealClustersCal Poly launches an AI data center on campus. Take a look insideInferenceArista takes aim at the next AI network battleground: distributed inferenceDealsOpenAI Signs 457 MW AI Data Center Deal as AMD Expands Its Challenge to NvidiaClustersBehind Dell AI Factory’s NVIDIA & AMD Enterprise Expansion
EveryNeocloud

GPU cluster region, United States

Abilene (Stargate)

West Texas town that hosts the first Stargate campus, built by Crusoe and leased to Oracle for OpenAI.

Abilene, a West Texas town of about 125,000 people, is home to the first campus of the Stargate project, the joint venture of OpenAI, SoftBank, Oracle and MGX. Crusoe developed the site, Oracle leases it and runs the Nvidia GB200 systems, and OpenAI is the main user. It is planned at about 1.2 gigawatts (GW) across eight buildings.

The build

Construction began in June 2024. Nvidia GB200 racks started arriving in June 2025, and Crusoe said the first two buildings, with more than 200 megawatts (MW) of IT load, went live on 30 September 2025. Six more buildings were planned to bring the campus to about 1.2 GW. A joint venture of Crusoe, Blue Owl Capital and Primary Digital Infrastructure owns the buildings, and JPMorgan led billions of dollars of construction loans. Reports in 2026 said plans to expand beyond the committed 1.2 GW had been dropped.

Why West Texas

West Texas has wind, solar and natural gas, open land and a power grid, ERCOT, that is run inside the state. Developers can build on-site gas generation and batteries next to the grid connection, which shortens the wait for power. The campus uses closed-loop liquid cooling to limit water use. Local leaders welcomed thousands of construction jobs, while others have asked about the strain on the state grid during heat waves.