DealsCorvex agrees USD 103 million take-or-pay deal to perform AI inference with Mid-Atlantic GPUsSovereignNeysa scales AI infrastructure in India with AMD Instinct MI350X GPUs on TytanInferenceMicrosoft Foundry adds Baseten, DeepSeek AI inference (MSFT:NASDAQ)ClustersDataOne and Rowan University sign engineering co-op program agreement for DataOne's Vineland AI factoryClustersLook inside Cal Poly's $3 million AI Factory (Video)DealsOpenAI Taps AMD Chips for 457 MW of AI Capacity in Six-Year TensorWave DealClustersCal Poly launches an AI data center on campus. Take a look insideInferenceArista takes aim at the next AI network battleground: distributed inferenceDealsOpenAI Signs 457 MW AI Data Center Deal as AMD Expands Its Challenge to NvidiaClustersBehind Dell AI Factory’s NVIDIA & AMD Enterprise ExpansionDealsCorvex agrees USD 103 million take-or-pay deal to perform AI inference with Mid-Atlantic GPUsSovereignNeysa scales AI infrastructure in India with AMD Instinct MI350X GPUs on TytanInferenceMicrosoft Foundry adds Baseten, DeepSeek AI inference (MSFT:NASDAQ)ClustersDataOne and Rowan University sign engineering co-op program agreement for DataOne's Vineland AI factoryClustersLook inside Cal Poly's $3 million AI Factory (Video)DealsOpenAI Taps AMD Chips for 457 MW of AI Capacity in Six-Year TensorWave DealClustersCal Poly launches an AI data center on campus. Take a look insideInferenceArista takes aim at the next AI network battleground: distributed inferenceDealsOpenAI Signs 457 MW AI Data Center Deal as AMD Expands Its Challenge to NvidiaClustersBehind Dell AI Factory’s NVIDIA & AMD Enterprise Expansion
EveryNeocloud

GPU cluster region, United States

Memphis (Colossus)

Home of Colossus, the AI training cluster built for xAI in a former Electrolux factory, and its larger successors across the state line.

Memphis became an AI compute hub almost overnight in 2024, when xAI turned a former Electrolux appliance plant in South Memphis into Colossus, a training cluster of about 100,000 Nvidia H100 GPUs. The cluster has since grown into a group of sites in Memphis and neighbouring Southaven, Mississippi. xAI became part of SpaceX in 2026.

Built at speed

Colossus 1 began construction in 2024 and was running by the summer, a pace that surprised the industry. It was later expanded with more H100, H200 and Blackwell GPUs. In 2025 xAI bought a much larger warehouse in Memphis for Colossus 2 and a power plant site in Southaven, aiming at the first gigawatt-scale training cluster. The machines trained the Grok family of models. Mississippi has since approved further campuses near Southaven.

Turbines and the neighbours

To get power before the grid could supply it, xAI ran dozens of mobile natural gas turbines at the site. Local groups and environmental lawyers said the turbines ran without proper permits and worsened air quality in a mainly Black neighbourhood that already lives next to heavy industry. The county health department later granted permits for some turbines, and xAI says it has added grid power, Tesla Megapack batteries and a water recycling plant. The dispute has continued before regulators, and groups have threatened to sue.

Providers of Memphis (Colossus)

Photo credits on this page

The small pictures above come from Wikimedia Commons under free licences. Some are cropped to fit.

The weekly digest

Every Monday: the provider of the day, new pages on EveryNeocloud, and the conferences and anniversaries of the week ahead.