DealsCorvex agrees USD 103 million take-or-pay deal to perform AI inference with Mid-Atlantic GPUsSovereignNeysa scales AI infrastructure in India with AMD Instinct MI350X GPUs on TytanInferenceMicrosoft Foundry adds Baseten, DeepSeek AI inference (MSFT:NASDAQ)ClustersDataOne and Rowan University sign engineering co-op program agreement for DataOne's Vineland AI factoryClustersLook inside Cal Poly's $3 million AI Factory (Video)DealsOpenAI Taps AMD Chips for 457 MW of AI Capacity in Six-Year TensorWave DealClustersCal Poly launches an AI data center on campus. Take a look insideInferenceArista takes aim at the next AI network battleground: distributed inferenceDealsOpenAI Signs 457 MW AI Data Center Deal as AMD Expands Its Challenge to NvidiaClustersBehind Dell AI Factory鈥檚 NVIDIA & AMD Enterprise ExpansionDealsCorvex agrees USD 103 million take-or-pay deal to perform AI inference with Mid-Atlantic GPUsSovereignNeysa scales AI infrastructure in India with AMD Instinct MI350X GPUs on TytanInferenceMicrosoft Foundry adds Baseten, DeepSeek AI inference (MSFT:NASDAQ)ClustersDataOne and Rowan University sign engineering co-op program agreement for DataOne's Vineland AI factoryClustersLook inside Cal Poly's $3 million AI Factory (Video)DealsOpenAI Taps AMD Chips for 457 MW of AI Capacity in Six-Year TensorWave DealClustersCal Poly launches an AI data center on campus. Take a look insideInferenceArista takes aim at the next AI network battleground: distributed inferenceDealsOpenAI Signs 457 MW AI Data Center Deal as AMD Expands Its Challenge to NvidiaClustersBehind Dell AI Factory鈥檚 NVIDIA & AMD Enterprise Expansion
EveryNeocloud
The w:Blue Waters petascale computing facility at the w:National Center for Supercomputing Applications

Blue Waters

A US petascale research supercomputer at the University of Illinois Urbana-Champaign

Photo: HorsePunchKid, CC BY-SA 3.0, via Wikimedia Commons

Blue Waters was a large research supercomputer run by NCSA at the University of Illinois Urbana-Champaign, built by Cray Inc. and funded by the US National Science Foundation. It went into phased service in 2012 and ran until 31 December 2021, when the Delta project took over its role.

Share on WhatsApp

  • Funded with $208 million from the US National Science Foundation
  • Cray Inc. built it under a $188 million contract after IBM withdrew
  • 13.3 petaFLOPS with over 1.5 petabytes of memory
  • Ran from 2012 until 31 December 2021, then replaced by Delta
  • Housed in a LEED Gold facility in Illinois

What it is

Blue Waters was a leadership-class research machine housed at the University of Illinois Urbana-Champaign and run by the National Center for Supercomputing Applications. Cray Inc. supplied the hardware, which combined roughly 49,000 AMD processors in Cray XE6 and XK7 cabinets. The system delivered 13.3 petaFLOPS and held more than 1.5 petabytes of memory alongside 26.5 petabytes of disk. Its purpose was open scientific and engineering computing rather than commercial cloud service.

How it came about

The National Science Board cleared funding for a top-tier supercomputer on 8 August 2007, and the National Science Foundation committed $208 million to the project. IBM was originally contracted to supply the hardware but pulled out on 8 August 2011, refunding payments already made. Cray Inc. then signed a $188 million deal with the university to build the machine. Installation happened in stages through 2012. Service ended on 31 December 2021, and the Delta project began in April 2022 as its successor.

The compute

The machine paired about 49,000 AMD CPUs with 237 Cray XE6 cabinets and 44 Cray XK7 cabinets. Memory exceeded 1.5 petabytes, while disk storage passed 25 petabytes and tape could reach 500 petabytes. A Cray Lustre parallel file system, delivered through a Sonexion array rated at 1.1 terabytes per second, handled data movement. Wide area links ran at 300 Gbit/s. Software ran under the Cray Linux Environment.

Where the GPUs are

The system sat in the National Petascale Computing Facility, a purpose-built 88,000-square-foot building at Oak Street and St. Mary's Road on the Urbana-Champaign campus. Its machine room covered 20,000 square feet and the structure earned LEED Gold certification. Cooling drew on the campus water system plus on-site towers that exploit cold Illinois winters. Fluid dynamic modelling shaped the cooling design, and data centre efficiency was estimated at 85 to 90 percent.

Blue Waters
A drawing made by EveryNeocloud from what this page says. It is a diagram, not a picture of the real provider.

Customers and deals

Blue Waters supported science and engineering workloads, sustaining at least one petaFLOPS on real application codes. Access came through the National Center for Supercomputing Applications at the University of Illinois Urbana-Champaign, with the National Science Foundation as sponsor.

Money and ownership

The National Science Foundation put $208 million into the Blue Waters project. After IBM withdrew, Cray Inc. received a $188 million contract from the university to deliver the system.

Its place in AI

The National Science Board framed the project as a leadership-class system intended to be the most powerful of its kind. It served the US research community from 2012 until the end of 2021, when Delta took over its role at NCSA.

Questions and criticism

Machines of this scale bring cooling and power challenges, which shaped the design of the dedicated facility. Efficiency there was put at 85 to 90 percent, well above the roughly 40 percent typical of large data centres.

Questions people ask about Blue Waters

What was Blue Waters?

It was a petascale supercomputer used for scientific and engineering research. NCSA operated it at the University of Illinois Urbana-Champaign, with Cray Inc. supplying the hardware and the National Science Foundation providing funding.

Who paid for it?

The US National Science Foundation awarded $208 million for the project. Cray Inc. later received a $188 million contract from the university to build the machine after IBM ended its earlier hardware agreement.

How fast was it?

Blue Waters reached 13.3 petaFLOPS and sustained at least one petaFLOPS on real science and engineering codes. It held more than 1.5 petabytes of memory and more than 25 petabytes of disk storage.

Where was it located?

It sat in the National Petascale Computing Facility on the Urbana-Champaign campus, at the corner of Oak Street and St. Mary's Road. The LEED Gold building used campus water cooling and winter air to cut energy use.

Is it still running?

No. Operations stopped on 31 December 2021. The Delta project took over its role at NCSA in April 2022.

Good reading and sources

Where this page comes from

The facts on this page come from the Wikipedia article "Blue Waters", written by its contributors and used under the CC BY-SA 4.0 licence, and from its Wikidata record (CC0). EveryNeocloud rewrote the text in its own words, with AI assistance, and compares every page with the article to make sure no passage is copied. It may be reused under the same CC BY-SA 4.0 licence with a link back.

It may contain mistakes, and figures change over time. Nothing here is investment or buying advice. If something is wrong, tell us. Last refreshed 2026-11-14.

Photo credits on this page

The small pictures above come from Wikimedia Commons under free licences. Some are cropped to fit.

The weekly digest